Menu
About Us
Products
Innovation
Careers
Contact
Phone
Building a Better Tomorrow
Many parking lot owners are thrilled to learn that they can cover an old asphalt parking lot with concrete pavement. The many benefits of a concrete parking lot include: increased lighting, safety and reduced annual maintenance cost. A concrete parking lot provides a warm welcome to customers and clients.
I-10 Connect's multi-year project required more than 100,000 tons of asphalt material, as well as aggregates and concrete paving.
GCC's Soledad Canyon project required more than 25,000 tons of asphalt material.
GCC pours industrial floors in large format slabs, up to 1,500 m² without a joint control, shrinkage-compensating concrete floor.
GCC’s volumetric truck and Rapid Set® lowered construction costs and had the road ready for use in hours.